Why there is no list price
Asking how much does a plywood box making machine cost is a reasonable question with an unreasonable answer: the same nominal machine can be built across a wide range, because the configuration is set by the box you intend to make rather than by a catalogue.
We do not publish prices, and it is worth explaining why rather than hiding behind that. A press quoted without a panel width is a press that will be re-quoted. A buckle machine quoted without a fastening count is quoted against a guess. The number that arrives first is almost never the number that gets ordered, and the gap between them is usually a scope disagreement rather than a negotiation.
What can be answered honestly is which decisions move the number, and in which direction. Six of them do most of the work.
Decision one: press force and working width
The press is the machine most sensitive to the box, because its two headline figures come straight off the drawing.
Press force is set by the edge section you have to close and the panel thickness behind it. The quoted 2.5 m build runs at 30 t nominal force; the press series is built from 40 to 100 t for heavier sections and thicker panels.
Working width is set by the panel you intend to edge in one pass. The 2.5 m build covers a 2.5 m working width, and platen sizes go to 1,300 × 8,500 mm. A box wider than the working width has to be edged in more than one pass, or split, or the press has to be larger — and that is a step change in cost, not a small one.
Decision two: how many dies and how often you change them
A die is set per edge profile, and every profile you run needs its own. The question that decides what you buy is not how many profiles exist in theory, but how often you change between them.
A producer running one box design needs one die and a changeover that happens rarely. A producer running six designs on one line needs either six dies or a changeover procedure that is fast enough to be routine. Both are legitimate; they cost differently.
Decision three: the level of automation
Three stages can be operated at very different levels: manual loading and indexing, semi-automatic with the operator handling panels and the machine handling placement, and a line where the panel moves between stages without being re-registered.
Two things scale with automation. The capital cost rises steeply, and the changeover time falls. Whether that trade is right depends on your batch pattern: many small batches reward fast changeover, one large repeated batch rewards throughput.
This is the decision most often made by accident, because it is easier to compare machine specifications than to compare batch patterns.
Decision four: power, foundation and installation
Rated power is published for each stage: 6 kW for the buckle machine DA-8000, 6 kW for the forming machine GA-8000, 3 kW for the quoted 2.5 m press build, with the press series stated at 12 to 15 kW.
Those figures decide whether your supply can take the machines at all, and upgrading a supply is a cost that belongs in the project rather than in the machine quotation. The same applies to the floor: a press needs a base that will not settle, and preparing one after the machine arrives is the most expensive way to do it.
Voltage and phase are confirmed against your site before order, because the same machine is built for different supply arrangements.
Decision five: tooling, spares and the first year
A quotation that covers the machine and nothing else is incomplete. The first year of a line needs consumables, a spare set of the parts that wear, and the training to run a changeover without calling the supplier.
Ask for these as a separate line rather than as an inclusive figure. An inclusive figure hides how much of the price is support, and support is the part that determines whether the line runs at its rated capacity in month three.
Decision six: whether you buy a stage or a line
Each stage is quoted with its own specification sheet, so a partial purchase is normal. A workshop that already forms edges can add fastening alone. One that only needs to close joints never buys the press.
Buying a line rather than a stage changes the price in two directions. The three stages can be matched before they ship — dies, press working width and floor layout — which removes a class of integration problem. But it also commits you to a layout, and a layout is the hardest thing to change later.
What to put in the enquiry
If you want a number you can use, send five things.
With those five, a quotation is a calculation. Without them, it is a placeholder, and placeholders are where projects lose months.
- Panel thickness range, in millimetres.
- Largest and smallest box dimensions, including which dimension is the largest.
- Fastening count per box, or the joint pattern from a drawing.
- Target output, in boxes per shift, with the shift length.
- Site power available (voltage, phase, rating) and whether the floor is existing or new.
| Press width and force | Largest single step; set by the widest panel you need to edge in one pass |
|---|---|
| Level of automation | Steep, and it trades capital against changeover time |
| Die count | Moderate, and driven by how many profiles you actually run |
| Power and foundation | Outside the machine price but inside the project cost |
| Stage or line | Not a price difference so much as a commitment difference |